Specialized crews for manufacturing plants, cold storage, food processing, distribution centers, data centers, automotive/EV facilities, and pharma/biotech across NC, SC, GA, and TN. Production-hour sequencing, OSHA 1910.28 compliance, manufacturer-backed warranties.
A licensed PM has your request. We'll reach out within 24 business hours — typically sooner. If your roof is actively leaking, call (866) 487-8572 for same-day response.
A 200,000 sqft manufacturing plant roof replacement isn't a scale-up of a 10,000 sqft retail TPO job. It's a coordinated shutdown-free construction project where every decision cascades into plant production, OSHA compliance, insurance liability, and regulatory audit risk. Most commercial roofers lack the crew scale, the safety infrastructure, and the project-management depth to deliver industrial jobs cleanly. For cold storage and food processing facilities, the operational bar is higher still — vapor barrier integrity, FSMA-compliant workflows, and USDA/FDA-audit-defensible documentation.
We focus on industrial specifically because the Southeast is in the middle of the largest industrial build-out since the 1970s. Automotive and EV battery plants (Toyota in NC, VinFast in Chatham County, Hyundai's Georgia Metaplant, BMW in SC), CHIPS Act semiconductor facilities across the Triangle, hyperscale data centers for AI infrastructure, pharmaceutical and biotech expansion at RTP (Eli Lilly, Novo Nordisk, Amgen), and e-commerce distribution centers for Amazon, Walmart, and regional 3PLs are all driving roofing demand to record levels. NC permit data shows industrial commercial roofing demand up 12% year-over-year in Q1 2026. That's the wave we build for.
Our crews carry OSHA 1910.28 fall-protection certifications, 1910.147 lockout/tagout procedures, USDA/FSIS clean-facility credentials, and bonded capacity to $5M single project. System specs cover 60-mil and 80-mil TPO as our default, EPDM single-ply for solar-integrated and shaded applications, standing seam metal for architectural commercial and hurricane zones, modified bitumen for heavy-traffic industrial, and silicone restoration coatings for life-extension on aging roofs. For commercial-scale jobs under 20,000 sqft we'll refer you to a residential-friendly contractor. For industrial work at scale across NRCA commercial standards, we're built for this.
We deliver this industrial capability across every major Southeast metro — see the metros index for the full coverage footprint. For Toyota Tier-1 supplier work in the Triad, BMW Tier-1 plants in Upstate SC, biotech and pharma facilities in RTP, hyperscale data centers in Atlanta data center alley, Boeing 787 aerospace Tier-1 in Charleston, HCA healthcare and Nissan/Ford supplier in Middle TN, post-Helene reroof in Asheville, and the full Charlotte commercial population in Mecklenburg and surrounding counties — each metro has its own permit environment, facility-spec discipline, and industrial anchors. Metro-specific pages document exactly how we work in each market.
Each carries its own spec, timing, and regulatory pattern. We bring credentialed crews and the right materials manufacturer for each.
Plant-production sequencing, OSHA 1910.28 compliance, re-shoring-era capacity
Fully-adhered TPO, vapor barrier preservation, FSIS/USDA-ready crews
Clean-standard workflow, drain relocation coordination, FDA-audit-safe builds
High-volume TPO at e-commerce scale, phased tear-off during off-hours
Hyperscale roof installs, cooling-unit coordination, redundant membrane
Battery-plant specs, SE manufacturing hub credentials, large flat-roof systems
Clean-room-appropriate roofing, FDA audit-friendly, RTP concentration
Every industrial roof has a right answer — and often a wrong one. Here's how we spec, by facility type.
Manufacturing, cold storage, and food processing projects completed across NC, SC, GA, and TN over the last 18 months — line-item bids, production-window sequencing, and manufacturer-registered warranties on every job.
50,000 sqft manufacturing plant to 500,000 sqft distribution center. Cold storage to data center. Line-item bid in 48 hours, production-hour plan included.